Rhino-mounts BOOM ARM MOWER DB150 Manuel d'utilisateur Page 120

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 196
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 119
OPERATION
DB150 07/11 Operation Section 4-14
© 2011 Alamo Group Inc.
OPERATION
8.2 Boom Unit Pre-Operation Inspection and Service
Inspect and service the boom arm and head prior to operation. Damaged and/or broken parts should be
repaired and/or replaced immediately. To ensure the unit is ready for operation, conduct the following:
OPS-B- 0020
8.1 Tractor Pre-Operation Inspection/Service
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to the
manufacturers recommendations. The following
are some of the items that require daily service and
inspection:
Tire condition/air pressure
Wheel lug bolts
Steering linkage
PTO shield
SMV sign is clean and visible
Tractor’s lights are clean and functional
Tractor Seat belt is in good condition
Tractor ROPS is in good condition
ROPS is in the raised position
No tractor oil leaks
Radiator free of debris
Engine oil level and condition
Engine coolant level and condition
Power brake fluid level
Power steering fluid level
Fuel condition and level
Sufficient lubrication at all lube points
Air filter condition OPS-U-0030
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
Vue de la page 119
1 2 ... 115 116 117 118 119 120 121 122 123 124 125 ... 195 196

Commentaires sur ces manuels

Pas de commentaire